Loading…
Loading…
826 live396 closing this weekmost from South East Central Railway and Indian Railways
826 results • Latest
Underground Railway Signaling Cable unscreened PVC insulated, PVC inner sheathed,armoured and PVC outer jacket with high conductivity annealed copper conductor size 6 Core x 1.5 sq.mm confirming to Specification No. IRS-S-63/2014 [Rev.4.0] with latest amendments.
Waiting Area/Airport Terminal/Public Place/Reception area Chairor Seat (V2) (Q2)
Tender for Price Agreement (PA) for supply of UNDERGROUND JELLY FILLED QUAD CABLE FOR SIGNALING AND TELECOM INSTALLATION,SIZE: 6 QUAD X 0.9 MM DIA,RDSO SPECIFICATION NO.IRS:TC-30/2005(VER.1) AMENDMENT NO.1 TO 5 OR LATEST AMENDMENT.
Construction of New BG Double Line from Kharsia (Km 0.00) to Balodabazar (Km 110.500) and Y-connectivity from Jharadih including earthwork in formation, bridges, ROR (Rail Over Rail), ROB (Road Over Bridge), RUB (Road Under Bridge), service buildings, staff quarters, P-Way works (including supply of Ballast, P-way material exept Rail), Electrification (2x25 KV OHE, PSI, PLC & Electrical General work), and Signalling & Telecommunication works, along with allied and associated miscellaneous works in connection with Kharsia- Parmalkasa 5th & 6th New BG Line Project under South East Central Railway in the State of Chhattisgarh.
25 kV Drop Out Fuse
NEW BROAD GAUGE SINGLE LINE OF RAILWAY PROJECT COMPRISING THE SECTION COMMENCING FROM PARADOL TAKEOFF POINT (KM 947.257) TO NAGPUR ROAD STATION ( CONNECTING POINT-KM:964.820) AND SLEWING OF EXISTING BORIDAND-CHIRMIRI LINE FROM KM:946.640 TO KM: 947.257 IN THE STATE OF CHHATTISGARH IN THE SOUTH EAST CENTRAL RAILWAY ZONE in EPC Mode.
Construction of New BG Double Line from Balodabazar (Km 110.500) to Parmalkasa (Km 280.840) and Y-connectivities from Lakholi station and Marauda Y Cabin including earthwork, Bridges, Rail over Rail (ROR) Bridge , Road over Bridge (ROB), Road under Bridge (RUB), station buildings, track works, Electrification, Signaling &Telecommunication works, and allied miscellaneous works in connection with Kharsia- Naya Raipur-Parmalkasa 5th & 6th Line Project under South East Central Railway in the State of Chhattisgarh.
Engineering Procurement and construction (EPC) contract For construction of New Railway line from Rowghat - Jagdalpur(140Kms) Package- I from Ch 12+700 to 42+600 from Kurkanar to Bhanpuri Excluding Kurkanar station and including Bhanpuri Station In connection of Dallirajhara - Rowghat - Jagdalpur New railway line in the state of Chhattisgarh.
PVC Sleeve of 3 to 5 mm thickness
Light Weight Petrol Driven Rail Drilling Machine
Breath Alcohol Analyzer
Abrasive Rail Cutter Machine
"Development of Maintenance Facilities for Amrit Bharat Trains at Coaching Depot/Bilaspur including Construction of Heavy Repair Bay and Service-cum-store Building for Amrit / Vande Bharat Train Maintenance at Bilaspur in Engineering, Procurement, Construction (EPC) mode".
Ground connection for universal type point machines (110V DC) complete with insulating materials.
LAN Extender as per RDSO specification No. RDSO/SPN/TC/82/2020 Rev. 2 .0 or latest