Loading…
Loading…
13,552 results • Latest
Fire Extinguisher
1) NUTRITIONAL SUPPLEMENT CONTAINING MINIMUM OF PROTEIN 8 G, CARBOHYDRATE 34 G, FAT 8 G IN 400 G TIN, 2) NUTRITIONAL SUPPLEMENT CONTAINING GLUTEN FREE HIGH PROTEIN MINIMUM 32G + WHEY PROTEIN AND CASEIN PROTEIN WITH 2.73G OF LEUCINE+ HIGH FIBER MIMIMUM 15G + ANTI OXIDANTS+ MINERALS FOR IMMUNITY VANILLA FLAVOUR FOR INPATIENTS MINIMUM-400 GM TIN, 3) NUTRITIONAL SUPPLEMENT CONTAINING GLUTEN AND TRANS FAT FREE MINIMUM WHEY PROTEIN 4.8 G CASIEN 7.5 G SOYA PROTEIN 4.3 CARBOHYDRATES 59 G ALONG WITH VITAMINS,MINERALS FRUCTO OLEGO SACCHARIDES ,MUFA,MALTODEXTRIN CARNITINE,TAURINE,SUN FLOWER SEED OIL,RAPE SEED OIL AND CALCIUM CASEINATE PER 100 GM -400 GM TIN & 4) RENAL NUTRITIONAL SUPPLEMENT CONTAINING MINIMUM OF 39.6 G/I PROTEIN, AMINO ACIDS, VITAMINS & MINERALS 400 G TIN
INDUSTRIAL DISPOSABLE FACE MASK
Straight metric metal thread End
Capacitor 25 MFD (C) 560V (RMS) suitable for RC Damping panel of Vacuum Circuit Breaker
BRIDGE ASSEMBLY, Rectifier - SCR - Silicon controlled exciter bridge- Utex No. 8455740 to EMD Part No. 8451653
SET OF BRAKE ITEMS FOR ONE BOGIE
VVVF DRIVE 3 PHASE AC TRACTION MOTOR TESTING PLANT
Horizontal Damper
PLUG BOARD
Weightand High Cranking Performance (V2) Conformingto IS14257 (Q3)
Portableelectrodeoven (Q3)
Impact Wrench (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Drinking Water Coolers (V4) ISIMarked To IS1475 (Q2)
Electrical arrangements for: 1. MS-VM- Improvement to platform and allied works at POTI, CTM, MMNK, SKL, PWU, OV, KGZ, MMK, MLMR, ACK, TZD, OLA, TMV, MTL, PEI, VVN & MYP stations under ADEN/CGL Sub-division. 2. MS-VM- ADEN/CGL Sub Division - Improvement to platform No. 3 Downline and Improvements to Approach roads at Padalam (PTM) Station).
Proposed Replacement of Existing VDU and Embedded PC at 4 stations (SCT, AYVN, EDN, PUU) on codal life basis and Replacement of VRLA Battery on codal life basis over MDU division.
Overhauling of ELGI make 1750 LPM compressor of 3 phase Electric Locomotives for a period of two years.
Senior Section Engineer/Permanent Way/Tirur section: Supply of experienced , conversant and medically fit men for outsourcing Monsoon patrolling duty. (During the monsoon for the year 2026-27 & 2027-28 for a period of 2 years).
Zonal contract for execution of bridge works and supply of materials in Palakkad division for a period of 1 year from 01/07/2026-30/06/2027 - Zone E IV-Bridge Works under Assistant Divisional Engineer/Kannur section.
Zonal contract for execution of bridge works and supply of materials in Palakkad division for a period of 1 year from 01/07/2026-30/06/2027- Zone E V-Bridge works under Assistant Divisional Engineer/Mangalore section.
Zonal contract for execution of bridge works and supply of materials in Palakkad division for a period of 1 year from 01/07/2026-30/06/2027 - Zone E III-Bridge works under Assistant Divisional Engineer/Bridges (Feroke-Mangaluru Central & Mangaluru Central-Panambur section).
Zonal contract for execution of bridge works and supply of materials in Palakkad division for a period of 1 year from 01/07/2026-30/06/2027 for Zone A IV-Bridge works under Divisional Engineer/East Jurisdiction (Podanur-Ferok; Palakkad- Pollachi; Pollachi-Podanur; Shoranur-Shoranur B cabin and Shoranur-Nilambur section).
Modification to existing OHE arrangements in connection with Provision of FOB under Amrit Bharat station Scheme in Chennai Division.
Improvements to existing OHE by elimination of silver brazed/codal life completed contact wire on condition basis in non-suburban sections of Chennai Division.
Modification to existing OHE arrangements in connection with Provision of up loop line at Kettandapatti(KDY) in AJJ - JTJ section of Chennai Division.
Replacement of existing 65 sq.mm weak catenary wire in MAS-RU and AJJ- JTJ section of Chennai Division.
INSULIN GLARGINE 100 I.U/ML, 3 ML CARTRIDGE
Tie bar assembly to RDSO Drg No. SK.VL-186. Note: Supply by SOURCES as per CLW Item ID: 2101027 in IREPS Vendor Directory.
Set of "Under Frame Front Part Complete for LHB Coaches as per RCF Drg . No. LE11461 Alt b with Ferritic Steel (C-K201, X2CrNi12) Top Flange as per latest RCF Drg. No. LE-11284, Alt.g & LE- 11285, Alt.h" and "Front part Replacement kit as per Annexure-A".
ALKALINE AA BATTERY USED IN WALL CLOCKS [ALKALINE AA BATTERY USED IN WALL CLOCKS AND REMOTES IS A NON-RECHARGEABLE 1.5 V PRIMARY CELL (IEC LR6) WITH ZINC-MANGANESE DIOXIDE CHEMISTRY, MEASURING ABOUT 50.5 MM IN LENGTH AND 14.5 MM IN DIAMETER. MAKE;PANASONIC/DURACELL/EVEREADY/NIPPO ONLY. Note:- Manufacturing date should not be older by more than three months from the date of supply.] BATTERY CELL 9 VOLT ALKALINE CELL, SIZE [BATTERY CELL 9 VOLT ALKALINE CELL, SIZE 6LR61, MADE WITH ALKALINE ZINC MANGANESE DIOXIDE AND CONTAINING NO ADDED MERCURY OR CADMIUM, FEATURING A METAL-JACKET SNAP TERMINAL. MAKE;PANASONIC/DURACELL/EVEREADY/NIPPO ONLY Note:- Manufacturing date should not be older by more than three months from the date of supply]
EARTH DISCHARGE ROD COMPLETE AND ACCESSO [EARTH DISCHARGE ROD COMPLETE AND ACCESSORIES AS PER RDSO SPEC PSI-BUSBAR TYPE (36-50MM OD) SPEC: ETI/OHE/51(9/87) REV- 1 OCT-92. Make:-UEE/IM/HITRONICS/PEC and SDEE only.
NANOVALENT HUMAN PAPILLOMA VIRUS TYPES (6,11,16,18,31,33,45,52,58) RECOMBINANT VACCINE PFS
SEMAGLUTIDE 0.25 MG & 0.5 MG SOLUTION FOR INJECTION (R-DNA ORIGIN) IN 1.5ML PFS
EQUALISING STAY PIN DIA 50 x 623 FOR BOGIE BOLSTER SUSPENSION.
Borescope - Inspection equipment (Q3)
Provision of AT in order to facilitate interlocking arrangements including EOLB with SLB at Non Interlocked LCs in TVC Division - TRD portion of work
Monthly Basis Cab & Taxi Hiring Services - MUV; 2600 km x 320 hours; Outstation
Monthly Basis Cab & Taxi Hiring Services - MUV; 2600 x 320 hours; Outstation