Loading…
Loading…
31 results • Latest
Others Utility Shifting WSS to Cherthala Municipality and adjoining Villages-Rerouting of KWA Pipelines infringing upon bridges works in Aroor area.-Pipeline Work
DEPOSIT RWSS Aryad Grama Panchayath Installation of R O plant Ward 4 at Mathruka Anganvadi
Hiring of vehicle below 1500CC model not before 2019 or latest on contract basis for One year for the various works under P.H Division
DEPOSIT-UWSS to Chengannur and Augmentation of UWSS to Chengannur- Disconnection of public tap in various places of Chengannur Muncipality-General Civil Work
DEPOSIT-KWA-Existing utility Shifting -For the construction of Kubalangi- Keltron Bridge for KRFB in Aroor Panchayth-KWA-Existing utility Shifting -For the construction of Kubalangi- Keltron Bridge for KRFB in Aroor Panchayth-Pipeline Work
State Plan-2024-25-Optimization of Production and Transmission-JICA Assisted water supply Scheme in cherthala Muncipality and Adjoining Panchayaths Replacement of damaged MS pipes in TWPM and painting the exposed MS Pipes, Replacing damaged Valves.-
KWA-Hiring of Vehicle - Below 1500CC motor cab of model 2021 or latest on contract basis for a period of one year for the the use of PH Division, Kerala Water Authority, Kayamkulam
DEPOSIT-CSME- Extension of 63mm PVC distribution line and providing bulk meter connection for Marigold apartments in Cherthala Municipality-Pipeline Work
DEPOSITRWSS to Punnapra Supply Erection and Commissioning of Submersible Pump set at Tsunami colony and Pipe line extension in various wards in Punnapra South Panchayatin Punnapra south panchayathGeneral Civil Work
O AND M - Water Supply Schemes-DEMOLISHING OLD DAMAGED OHSR AND PUMP HOUSE-MACE OF RWSS TO CHINGOLI DEMOLISHING DILAPIDATED CIVIL STRUCTURES - DEMOLISHING OLD DAMAGED OHSR AND PUMP HOUSE NEAR IDEAL COLLEGE AT VAYANASALA JUNCTION IN WARD 9 OF CHINGOLI