Loading…
Loading…
68 results • Recent activity
Providing Commissioning Erection Testing including Carriage Loading Unloading charges of main ACB Panel with all accessories and complete in all respect at first stage of singhwahini pump canal block kamasin distt banda
construction of CC lining Reach From2.340 to 2.625 Km 285.00 mtr total in main cana to Kulaba No 14 at Gurha pump canal block naraini distt banda
355 mm dia 500 mm dia HDPE Pipe Line Laying and Commissioning with Speacials and Fitting at Ramjanki pump cana Block Badokharkhurd Distt Bandal. lot 6
Supply and fixing of 16 Mtr High mast Pole with HPSV Flood Light at Balaji pump canal block badhokhar distt Banda Lot 5
supply erection testing and commissioning of OFF Grid Solar PV Power plants of 2 KW capacity at daulatpur Pump canal second stage block badhokhar distt banda Lot 4
construction of CC lining work reach from 0.255 km to 0.575 Km in main canal and reach From 0.00 to 0.050 in Tarauha minor And reach From 0.00 to 0.050 Km in sonepur minor At Sonepur minor block karwi distt chitrakoot