Loading…
Loading…
10 results • Recent activity
Fabrication, Providing and Installation of 630 KVA, 3 Phase, oil cooled, totally copper wound SERVO Stabilizer, having voltage range, High and Low cut off through suitable MCCB, suitable for unbalanced power supply at Ram Nagar Sikari Pump Canal.
Providing and Laying of 630 mm2 3.5 Core Aluminium Armoured LT Cable at Ram Nagar Sikari Pump Canal, Including cast of all Material, Labour, Jointin, Carriage upto site and Laying with all Tand P used for proper completion of work.
Construction of stone lining and earth work in main canal reach from 1.250 Km to 1.300 Km and T-Point of Rampur Minor and Rampur DY Minor Length 100 Mtr. at Hargarh Ist Pump Canal.
Construction of stone lining and earth work in main canal reach from 0.695 Km to 0.795 Km and 0.800 Km to 0.950 Km at Hargarh Ist Pump Canal.
Construction of stone lining and earth work in main canal reach from 0.425 Km to 0.475 Km and Kashisarpti minor (T-Point) reach from 0.000 Km to 0.040 Km at Hargarh Ist Pump Canal.
Earth work in canal for strengthening of weakened bank and daula with correcting of internal section in main canal (Dah No.-02) reach from 1.000 Km to 2.400 Km at Mahuwarikalan Pump Canal.