Loading…
Loading…
1,020 results • Latest
Annual Contract for desilting and cleaning of sewer drainage machineholes of existing drainage line with Pavadi in Sub Zone-04 in South Zone-A (Udhana), Surat.
Annual Contract for desilting and cleaning of sewer drainage machineholes of existing drainage line with Pavadi in Sub Zone-03 in South Zone-A (Udhana), Surat.
Annual Contract for desilting and cleaning of sewer drainage machineholes of existing drainage line with Pavadi in Sub Zone-02 in South Zone-A (Udhana), Surat.
Annual Contract for desilting and cleaning of sewer drainage machineholes of existing drainage line with Pavadi in Sub Zone-01 in South Zone-A (Udhana), Surat.
Repairing & desilting of machine holes by entering skill labour (manual work) with using necessary protecting gears and safety equipments, placing plugs and dewatering pumps etc. in various existing sewage / storm drainage lines, machineholes etc. including carting of desilted materials, and debris from site and raising existing road level machinehole, chamber cover & metal detector machine to finding in various society area / at various places of sub zone-3 in south west(athwa) zone, surat municipal corporation, surat.2nd Attempt
Providing & Laying Strom Drainage line and Construction R.C.C Box at T.P. Scheme no.75 (Vesu - Abhva- Gaviyar - Magdalla) on Various T.P. road in South West (Athwa) Zone, Surat. Phase-6. 2nd Attempt
PROVIDING & LAYING STROM DRAINAGE LINE AND CONSTRUCTION R.C.C BOX AT T.P. SCHEME NO.75 (VESU - ABHVA- GAVIYAR - MAGDALLA) ON VARIOUS T.P. ROAD IN SOUTH WEST (ATHWA) ZONE, SURAT. PHASE-5. 2nd ATTEMPT
Providing all-inclusive comprehensive Design Consultancy Services for Construction of Residential facilities for Officer s accommodation at various Locations for SMC,Surat
Renovation and Upgradation of Existing Toilet Blocks from 2nd to 3rd floor of D,F,G and H Building, 2nd to 6th floor of E Building, 2nd to 4th floor of I Building at SMIMER Hospital Umarwada, Surat.
All inclusive annual maintenance of various ac machines, water coolers & refrigerators installed at SMIMER campus for 03 years. (6th Attempt)