Loading…
Loading…
5,957 results • Recent activity
MTPS1 TM Unit II Overhauling of OLCTC System Pump LHS RHS Overhauling 1600 mm Butterfly valve and its actuator gear box of cooling water inlet and outlet pipe lines in condenser Inspection Cleaning of Condenser CW box steam side Hot well
Procurement of 1.5 Ton Split air conditioner unit including copper condenser with given accessories - 8Nos.
MTPS I Mill Plant Unit III Removal of worn out thinned out wall plates of bunkers 3A 3B and 3C and erection of new wall plates of 12 16 mm thick MS plates and supporting beams and other related works
MTPS I TM UNIT III Changing the defective BFP 3B discharge NRV as per IBR specification by IBR welding and replacement of the defective BFP Suction valve 3B changing the eroded drip line reducers expanders and changing the defective eroded plug broke
MTPS I TM Unit III Overhauling and gasket renewing of Valves in Feed Water Main Condensate Heater drain drain water and Auxiliary Steam during Unit III AOH 2025 26
MTPS I Mill Plant Centralised AC Plant Attending Breakdown works in AC Compressor No 2 and 3 AC Cooling tower fans Air handling units Air washer system Circulating water pumps pipe lines and valves etc for a period of 365 days