Loading…
Loading…
4,890 results • Latest
MTPS-I ES circle EMI UnitIII Releasing the Hydrogen coolers 1,2,3 4 from the Generator III casing and cleaning of the cooler tubes, replacing the water boxes gaskets, conducting hydraulic test, reassembling of the Hydrogen cooler with Turbo Genera
MTPS-I ES Circle EM-I Unit-II Dismantling and reassembling of HTLT terminal links of generator Transformer-III, UAT - 2A UAT - 2B for conducting statutory testing of TG GT -II during Annual overhaul 2025
Supply of 4 1/2 feet V Cross Arm
MTPS-I ES Circle EM-I Unit-III Complete overhaul of 1 No 3500KW, 6.6KV HT Motor spare BFP motor Sl.No 44201-T421-11-01 released from BFP 3C bed
MTPS-I ES Circle CI FSSS 3 4 sub division - Repairing and Reconditioning of HEA Ignitor Tips, Rods, Flexible cable and Exciter Box
MTPSI ES Circle EM-II SDIII Complete rewinding of 1No failed ASPII D1 squirrel cage Induction HT motor Crompton greaves make, 200KW,1470 rpm, Sl.no HMHA2870076 at AHPH stage II during the year 2025 26
MTPS-I ES Circle CI UnitII Removal and refixing of pressure gauges, Temperature gauges switches, Transmitters after calibration - replacement of gaskets for all level switches cleaning of impulse lines and catch pots, etc. during Annual overhaul
MTPS-I ES Circle EM-I AC plant Yearly maintenance Half yearly maintenance Breakdown works in 4.0 ton cassette type ceiling mounted 2.0 ton split type wall mounted AC units in EM-I division for a period of 12 months from the date of Commencement of
MTPS-I ES Circle EM-I SDII Complete cleaning, tightness checking and checking IR value of 6.6KV HT bus 2A 2B and its bus ducts and annual maintenance works to be carried out in respect of critical LT modules LT breakers in USSG-2A 2B, SSSG-2, NE-
MTPS-I ES Circle EM I SD II Annual maintenance works to be carried out in respect of Turbo Generator Tri system of Unit-II during Annual overhau-2025