Loading…
Loading…
4,902 results • Latest
MTPS I CA CWS I Complete dismantling inspection Overhaul and renewal of pump components in 1 No Cooling Water Pump of capacity 16000 M3 Hr Single Stage VMF Model 1175 KW motor in stage I
MTPS I BM Pressure parts Units III and IV Boiler Preventive Breakdown maintenance of Boiler Pressure Parts HP LP Valves Burner tilt mechanism oil gun cleaning soot blower operation cleaning and allied works
MTPS I CA RWS Misc Clarifier I De watering sludge removal cleaning of complete clarifier with bleaching powder overhauling of flocculator and traction drive mechanism strengthening of corroded portion of the structures etc
MTPS I BM Lift Preventive Breakdown maintenance of 3 Nos Freight cum Passenger lifts Boiler Lift I Boiler Lift IV and VIP Lift II of MTPS I for the period of one year from the date of commencement of work
MTPS I CA CWS II Overhauling of existing ID fan Gearbox for 4 Nos including static balancing of fan blades painting of gear box fan blades hub and arm sleeves etc in CT II
MTPS I BM DM Plant and Lift Load Test certification of 1 Ton Capacity Chain pulley blocks 6 Nos at DM Plant stage I and II and Load test Certification of VIP Lift I II and Boiler Lift I to IV
MTPS I CA RWS Overhauling of Raw Water Pump No 04 and its butterfly valve Reconditioning of trash rack gates at Raw water pump house
MTPS I M I CA CWS I Fabrication of sun shield roof structure for replacing a portion of damaged Corroded sun shield roof structure and its doors provided over hot water basin on the eastern side of Cooling Tower II during COH 24 25 of Unit II
MTPS I BM Unit II COH 2024 25 ID fan 2A Reconditioning of the eroded discharge spiral portion in the ID fan top casing renewal of casing wear liner and other related works
MTPS I BM Unit II COH 2024 25 Replacement of the worn out Impeller wear liner plates and other related works in ID fan 2A including cost of impeller wear liner plate 1 set