Loading…
Loading…
4,902 results • Latest
TTPS Mech II BM Unit II Renewal of severely eroded parent duct plate in Top side walls of Unit II APH A flue gas outlet duct
MTPS I Mill Plant II Complete overhauling of gearbox mechanical face seal assembly worm shaft assembly replacing the worn out bulged insulation cover plate assembly scrapper assembly and worn out flexi coupling etc Releasing the journal spring
TTPS Mech II BM Unit II Erection of Hot Intermediate heating elements of Type E27 for Unit II Airpreheater Model 27 VIT M 2000
MTPS 1 Mill Plant Unit III Attending the Break down Preventive maintenance works such as overhauling of Gravimetric feeders mechanical face seal assembly renewal of vertical shaft thrust bearing worm shaft thrust and radial bearing airport rin
TTPS Mech II BM Unit II Erection of Hot Intermediate heating elements of Type DC for Unit II Airpreheater Model 27 VIT M 2000
MTPS I Mill Plant AC Plant Air Washer System Renewal of existing damaged Air grill Discharge diffuser with volume control dampers in air ducts at various location of Air washer system discharge duct of unit I to IV turbine floor battery charger
MTPS 1 Mill Plant Unit IV Reconditioning of worn out journal shafts released from Unit I to IV
NCTPS I ES Circle EM II Dn S Dn I Unit II Overhauling of HT ID fan motor 2B Sl No 32348 P 401 01 01 at Boiler area 0 mtr and complete cleaning and maintenance of HT motors 11 Nos to be carried out during the annual overhauling work of Unit II
MTPS I TM Unit II Inspection of Condenser tubes flaring and torque setting by using special tools Tube sheets Cleaning degreasing and Epoxy coating to the thickness of 1500 Microns on Condenser tube sheets of the condenser and Cleaning sand blasting
NCTPS I ES Circle EM II Dn SDn II RWPH Section Replacement of gasket to arrest oil leakage in 11 6 6 KV 5MVA power Transformer Make Transformer Switchgear Ltd Sl no 3590 at RWPH including hot oil circulation