Loading…
Loading…
4,885 results • Latest
Sweeping and Cleaning of all roads in Internal Coal Handling Plant area for the period from 01.04.2026 to 31.03.2027
Supply of Three Phase Angle Cross Arm
Sweeping and Cleaning of all roads floor areas of Power House of Unit 4 and 5 within the A zone area for the period from 01.04.2026 to 31.03.2027
TTPS ES Circle EM I Unit II Hot Oil Circulation of 71960 litres of existing Transformer Oils of 250MVA 15 75kV 230kV 3phase GT 16MVA 15 75 7 0kV UAT 2A 15MVA 15 75 7 0kV UAT 2B 1 6MVA 6 6kV 433V UST II and 2 0MVA 6 6kV 433V SST II to reinsta
Clearing the debris, garbages, ash and other wastages etc., in Internal Coal Handling Plant area for the period from 01.04.2026 to 31.03.2027
Supply of M.S.Bolt and Nuts of Various sizes
Clearing the debris, garbage, ash and other wastes etc., in Unit 4 and 5 and allied areas for the period from 01.04.2026 to 31.03.2027
10 80 Variable Load Hanger Assembly for condenser left and Right outlet pipes
Cleaning the Septic Tanks at various locations of ICHP and ECHP Office toilets, SS 2 to 6, PCH 1 and 2, SCH 1 and 2, etc. at ICHS areas for the period from 1.04.2026 to 31.03.2027
Cleaning the Septic Tanks available at various locations in Unit 4 and 5 A zone area and offices lying to the East of 457.5 E road in Stage 3 area for the period from 01.04.2026 to 31.03.2027