Loading…
Loading…
4,885 results • Latest
TTPS Operation Circle MPM I Unit II Attending to certain preventive and breakdown maintenance works in coal mills, RC feeders Hot, cold and seal air system of mills for a period from 01.04.2026 to 31.03.2027
TTPS ES Circle EM III Annual and quarterly maintenance in the 230 kV equipments available at Indoor Switchyard II and Annual maintenance of Station Transformer III SST A B in Unit IV V for the year 2026 2027
TTPS Operation Circle CAD CWPH II Releasing of fishnet and Trash rack gate at the entrance of C.W channel II at Harbour skimmer bay and the Travelling water screen Trash rack gates at CWPH II fore bay, cleaning and disposal of the debris and replaci
TTPS Mech II BM Breakdown Overhaul of equipments in pressure vessels Alkali and Acid storage tanks pipe lines pumps and blowers in DM plant I II for the period from 01 04 2026 and upto 31 03 2027
TTPS ES Circle MRT II Day to day routine cleaning Maintenance and signal termination checking of LAN Extenders Ethernet switches Fiber optic panels and switches Client computers and server computers of integrated Energy Management System IEMS
TTPS Operation Circle MPM I Unit III Overhauling of Roller Journal assembly and replacement of worn out grinding roller for the period from 01.04.2026 to 31.03.2027
TTPS Operation Circle CAD FOPH Attending preventive maintenance of fuel oil pump house equipments and line patrolling and removing the inflammable materials in and around pipe lines and Storage Tanks heavy oil IOC pumping lines and supply lines of U
TTPS Mech II TM II Breakdown Periodical Overhauling of Instrument and Service Air Compressor in Units IV V for the period from 01 04 2026 to 31 03 2027
TTPS Operation Circle MPM I Unit III Collecting of Coal rejects from the mill chute, dumping in the specified area, clearing the same, loading, transporting and dumping in a specified area of TTPS for a period from 01.04.2026 to 31.03.2027
TTPS Mech II BM Unit I to V Monitoring of water wall soot blowers and Long retractable soot blowers during daily operation in Unit I to V Boilers and retracting the swivel tubes and lance tubes if any stuck up found for a period from 01 04 2026 and u