Loading…
Loading…
5,725 results • Latest
Arresting Water Leakage in the Roof of Bunker Building at 52m elevation in Unit 4 area
ICHP- Cleaning, maintaining and tightness checking all proximity switches, PCRD CCRD system resistance wires, brushes, power control cables, etc., in Stacker-I and II
TTPS Mech II AHP Breakdown maintenance works in Ash slurry disposal lines of Unit III for the period from 01 04 2026 to 31 03 2027
ICHP- Cleaning of the spilled and accumulated coal in Stacker-I II and Reclaimer-I II machines associated areas and removal of coal chocking in coal transfer chutes in all the four machines.
TTPS MechII AHP Unit I II III Breakdown maintenance works of HDPE pipes and fittings of size 40mm and 75mm OD and rubber lining of 80 NB to 450 NB MS pipes fittings flushing apparatus in Unit I II III ECO APH hoppers for the period from 01
Repair and Maintenance Works to the Sunshade, Loft, Roof Terrace Tiles, Rain Water Downfall Pipes and Inner Rooms in Type 1 Quarters Block No. 13, 15 and 19 at Analmin Nagar