Loading…
Loading…
5,725 results • Latest
ICHP -Clearing the slided and spilled coal along the walkways over below deck sheets, between the track rails and outside the track rails both north south sides of Stacker-II and Reclaimer-II machine travel path in Conveyor-54.
TTPS Mech II AHP Removing the silt like ash coal and sand in slurry form below and front and backside of the weighbridge and in between the weighbridge and support walls for the period from 01 04 2026 to 31 03 2027
TTPS MechII AHP Unit IV V BAH ECO and APH Break down maintenance of HDPE pipes of various size from 32 mm OD to 450m welding of punctured joint new joints dismantling and reerection of the HDPE pipe of old new and rubber lining of MS pipe of vari
ICHP -Clearing the slided and spilled coal along the walkways over below deck sheets, between the track rails and outside the track rails both north, south sides of Stacker-I and Reclaimer-I machines travel path in Conveyor-49.
TTPS MechII AHP UnitI II III Breakdown works in Ash Water Pump House Overhauling of Bottom ash water pump High pressure water pump Low pressure water pump sump pump and valves for the period from 01 04 2026 to 31 03 2027
TTPS Mech.II AHP Attending Rubber lining works in Unit I II III BAH sea water supplied pipes lines fittings BAH manhole door acces door and over flow tank for the period from 01 04 2026 to 31 03 2027