Loading…
Loading…
5,645 results • Latest
TTPS ES Circle MRT II Day to day routine Cleaning Maintenance of Control protection panels and testing assistance activities pertaining to Generator Auxiliaries system 230KV Switchyard and MRT II lab Sub Division I MRT II of Unit 4 5 for t
TTPS Operation Circle Chemical Division Operation of Ferrous sulphate pumps for Units 3,4 and 5 and the Operation of Phosphate, Morpholine and Hydrazine dozing pumps for Unit 3 on round the clock basis for the period from 01.04.2026 to 31.03.2027
SUPPLY, DISMANTLING, ERECTION, TESTING AND COMMISSIONING OF CONSTANT LOAD HANGER ASSEMBLY CLH 2257 and 193 MODEL INCLUSIVE OF TIE RODS AND TURN BUCKLES FOR CRITICAL STEAM PIPE LINES IN UNIT V BOILER
TTPS Operation Circle MPM I Unit III Upkeepment of R.C. feeders and attending to shear pin renewal works for a period from 01.04.2026 to 31.03.2027
TTPS ES Circle EM III Routine cleaning of fly ash and coal dust in the HT fan motors Mill motors cable trays in Unit IV V for a period of twelve months from 01 04 2026 to 31 03 2027
TTPS Operation Circle CAD ACWPH I Inspection, checking of supply and return pipe lines of bearing cooling water, arresting leakages and assisting the shift engineer in all activities at Auxiliary Cooling Water Pump House-I by recording the parameters