Loading…
Loading…
5,645 results • Latest
TTPS Operation Circle MPM I Unit III Overhauling of Roller Journal assembly and replacement of worn out grinding roller for the period from 01.04.2026 to 31.03.2027
TTPS Operation Circle CAD FOPH Attending preventive maintenance of fuel oil pump house equipments and line patrolling and removing the inflammable materials in and around pipe lines and Storage Tanks heavy oil IOC pumping lines and supply lines of U
TTPS Mech II TM II Breakdown Periodical Overhauling of Instrument and Service Air Compressor in Units IV V for the period from 01 04 2026 to 31 03 2027
TTPS Operation Circle MPM I Unit III Collecting of Coal rejects from the mill chute, dumping in the specified area, clearing the same, loading, transporting and dumping in a specified area of TTPS for a period from 01.04.2026 to 31.03.2027
TTPS Mech II BM Unit I to V Monitoring of water wall soot blowers and Long retractable soot blowers during daily operation in Unit I to V Boilers and retracting the swivel tubes and lance tubes if any stuck up found for a period from 01 04 2026 and u
TTPS ES Circle EM III Fault attending replacing the defective parts and cleaning works in SVL MVL LED TL Fittings and plug points of all areas covered under unit IV and V Except Chimney for the period from 01 04 2026 to 31 03 2027