Loading…
Loading…
4,862 results • Latest
ECHP-II-Inspection, Checking and monitoring of the mechanical equipments with allied works in PCH-II such as 2 Nos Primary Crushers-2A 2B, 4 Nos. Belt Feeders -2A,2B,3A 3B, 2 Nos. Shuttle Feeder-1A 1B, 3 Nos. Reject conveyor 2A,2B 2C
ECHP-II-Inspection, Checking and monitoring of the mechanical equipments with allied works in SCH-II
Supply of 4500 Sets of Stay Set Complete
LT 3PHASE ANGLE X ARM
Supply of LT Shackle Insulator
LT Metal parts GI
MTPS I BM Unit I Boiler pressure parts AOH 2026 Rectification Replacement of defective tubes in water wall area S panel area Water wall reducer tubes etc
MTPS I BM Unit I Boiler pressure parts AOH 2026 Rectification Replacement of defective tubes in LTSH Coils Economizer hanger tubes steam cooled side walls and fin welding in boiler IInd pass area
MTPS I BM Unit I Boiler pressure parts AOH 2026 Rectification Replacement of defective Boiler tubes in 9th header and Economizer Coils at Boiler IInd pass area and Radiography testing of welded joints
Supply of LT Pin Insulator