Loading…
Loading…
6,050 results • Recent activity
MTPS I BM Unit I Boiler AOH 2025 Re conditioning and hard facing of used and worn out coal nozzles fixing of divider plates and allied works
MTPS I BM Lift Operation of Boiler Lifts I to IV and attending routine maintenance and Minor repair works of Boiler Lift II and its accessories for one year from the date of commencement of works for 2025 26
MTPS I Mill Plant Unit IV Dismantling of Fuel inlet elbow short Fuel inlet elbows long renewal of eroded FIE short Hard facing of released Fuel inlet Elbows long short and then assembling of fuel inlet Elbows during Annual overhaul 2025 26
MTPS I CA CWS II Complete Overhauling of 10 Ton monorail crane Load testing of 15 Ton monorail crane 1 No 10 Ton monorail crane 1 No 2 Ton Electrical wire rope hoist 2 Nos etc
MTPS I Mill Plant Unit IV Dismantling the eroded 90degree Ceralin coal bends from coal pipe lines and reconditioning the released one and then assembling the reconditioned bends in an appropriate manner in the coal flow system during Annual overhaul
MTPS I BM DM Plant Overhauling of Boiler Fill Pumps Hot well make up Pumps Effluent Water Transfer Pumps Degassed Water Transfer Pumps DM Water Transfer Pumps Stator Water Pumps Acid and Alkali unloading pumps in DM Plant Stage I and II and CST