Loading…
Loading…
53 results • Latest
PROVIDING AND INSTALLATION OF TARPAULIN SHED COVERING WITH BAMBOO STRUCTURE FOR VARIOUS BUILDING INSIDE ACTREC CAMPUS FOR 2026
Providing and fixing Tarpaulin shed for buildings including tarpaulin of suitable thickness, nails, ropes and bamboo etc. and labour required to fix the sheet in firm place and making the bamboo shed covering the terrace completely without any leakage and removing the same after 4 months of monsoon and cleaning the site of all materials and handing over the site as before as per the instructions of engineer incharge. The agency has to upkeep the shed intact throughout the mentioned period in all manners and see that it will not affect the services below. All the materials required for the erection of the shed will be in the scope of the agency. NOTE: Only Plan area of terrace which is covered will be measured and paid for including projections from building/parapet face.
Automatic Tissue Processor, Qty. 01 no. for Histopathology, TMH
Model:
Expression of Interest for Robotic Surgery System
TATA MEMORIAL CENTRE Annexure A
Operation and Comprehensive Annual Maintenance Contract (CAMC) for 265 KLD STP and 20 KLD ETP at MPMMCC
Operation & Comprehensive Annual Maintenance Contract (CAMC) for 265 KLD STP and 20 KLD ETP to be maintained in daily three shifts i.e. 24x7x365 days basis for Twelve months from the date of award of work, as per the directions of the Engineer-In-charge (E.I.C). Payment of chemicals/Consumables will not to be paid separately
Repairs and Maintenance Works for PG Student Room at SF, CRI, ACTREC
Dismantling stone slab flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material out of ACTREC premises with lead and lift,. Valid gate pass complete as directed and instructed.
Installation of Heavy-Duty Speed Breaker near RRU Building, ACTREC
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead up to 50 m and lift up to 1.5m, as directed by Engineer-in-Charge.