Loading
Loading…
Loading…
179 results • Recent activity
High Throughput Tube Labeler System ( for blood collection)
Renovation of Open Areas at 1st, 2nd and 3rd Floors in CRI Building at ACTREC
Renovation of Lab and culture room in KS 118 and KS 121 in CRI Building at ACTREC
Interior works for New HYLCYON (Bhabhatron bunker) at Radiotherapy Dept., Lower Ground Floor, CRC ACTREC
Stroke Analysis Software
Structural Audit and Preparation of BOQ for Strengthening and Waterproofing for the CRI, CRC and Ward block at ACTREC