Loading…
Loading…
159 results • Latest
Const. of Double loop dumbbell Interchange at the Junc. of NH52 HR n RJ Border Barwala and NH9 Delhi Sirsa at Dhandhoor in Haryana as part of Amritsar Kolkata Industrial Corridor under NH O on EPC mode
Construction of Six Lane Grade Separated Structure near Chintareddypalem Junction (at Km.1374.945) on Nellore Bypass section of NH-16 (Old NH-5) in the state of Andhra Pradesh on Engineering, Procurement and Construction (EPC) Mode.
Cons. of Long Term Remedial measures of River cut/bank erosion at identified 12 locations (i.e. RC-18 A-RC-22 RC-20 A-RC-25 A-RC-26 A-RC-24 A-RC-19 A-RC-20 and A-RC-21 RC-21 RC-23 RC-25) KULLU TO MANALI on K-M Sec. of NH03 (OldNH21) in HP on EPC
Const. of underpass VUP LVUP SVUP for long term mitigation measure on potential BS loc. from Sadak Seoni to Rahivada sec of NH-44 at km 574.930 1 VUP 2SVUP 585.675 LVUP 586.390 LVUP n 589.120 VUP under Road Safety in MP on EPC Mode.
Const of underpass VUP LVUP SVUP for long term mitigation measure on potential BS loca from Bhonga Kheda to Suktara sec of NH44 at km 593.950 VUP 610.360 VUP 615.920 VUP 621.140 VUP n under Road Safety in MP on EPC Mode
Const. of underpass VUP LVUP SVUP for long term mitigation measure on potential BS loca. from Ganeshganj to Chhapara Kalan sec of NH44 at km 554.100 VUP 554.400 LVUP 562.970 VUP 567.395 VUP 572.675 VUP under Road Safety in State of MP on EPC Mode.
Construction of a 4lane byp. from Thekma village(km36.300) to Gosai Bazar Byp.(km242.500) with 8.135km along with widen. from 2-4Lane from Smt. LM Jun. to PI for a length 4.70km and Streng. of NH-128A from PI-Moha Jun. 41.35km(54.185km) in UP on EPC
Removal of At-grade junctions at Panchganga Chowk in the Mohol-Wakhari section and at 61 Phata Malshiras in the Khudus-Dharampuri section of NH-965 in the State of Maharashtra on EPC mode
Strengthening Overlaying of the Aligarh-Palwal Section of NH-334D from Existing Km. 4.450 to Existing Km. 7.400 in the State of Haryana on Item Rate (percentage) basis
Strengthening-rehabilitation of rigid and flexible pavement with flexible overlay (50.93 km) and reconstruction (13.33 km) along with 04 years routine maintenance of Bhopal-Biaora section from Km.324 to Km.394.923 of NH-46 in MP on Item Rate Basis