Loading…
Loading…
148 results • Recent activity
Construction of the Icchak Flyover (with service road in partial length) at km 24.500-26.300 and Slip Road at Hazaribagh bypass from km 33.690-34.945 (LHS) and km 33.515-34.945 (RHS) section of Barhi-Hazaribagh 0.000-40.500 of NH-33 in Jharkhand
Removal of At-grade junctions at Panchganga Chowk in the Mohol-Wakhari section and at 61 Phata Malshiras in the Khudus-Dharampuri section of NH-965 in the State of Maharashtra on EPC mode
RFP for Construction of Four Lane Nagpur Katol section of NH353J including Mitigation Structures from Design Ch. 37.000 to Ch. 45.990 (Tiger Corridor-I) in the State of Maharashtra on EPC mode.
Const. of 03 nos. of VUPs at Ayodhya Bypass from km 135.120 to km 137.060 L1.940 km of NH27 (old NH-28) for Ayodhya Awas Vikas Parishad on EPC Mode Deposit work basis in Uttar Pradesh.
Upgradation of Existing Two-Lane Carriageway to Two Lane Carriageway with Paved Shoulder from Ch. 665.686 (Existing Km. 665.686) in Khanpur Village to Ch. 710.462 ( Km. 710.483 in Karvad Village (Length 44.776) Sec. of NH-56 in Gujarat on EPC Mode.
Upgradation of existing Four Lane Ahmedabad Godhra Highway from Km 60.000 to 105.000 L-45 Km sec of NH-47 in the state of Gujarat on EPC mode