Loading…
Loading…
159 results • Latest
Profile raising and strengthening of existing flexible pavement including flexible overlay (2.12 km) and reconstruction (22.817 km) along with 04years routine maintenance of Bhopal-Biaora section from Km.394.923-Km.421.450 of NH-46 in MP on Item Rate
Strengthening and Major repair of Chunchuluru - Nellore Section from Km.652.200 to Km.738.520 (Length 86.320 Km) of NH-67 in the State of Andhra Pradesh
Const. of 03 nos. of VUPs at Ayodhya Bypass from km 135.120 to km 137.060 L1.940 km of NH27 (old NH-28) for Ayodhya Awas Vikas Parishad on EPC Mode Deposit work basis in Uttar Pradesh.
Upgradation of existing Four Lane Ahmedabad Godhra Highway from Km 60.000 to 105.000 L-45 Km sec of NH-47 in the state of Gujarat on EPC mode
Four lane with paved shoulders from Budhel Junc. to Vartej Completion period 1.5 Years Maintenance period 5 Years Y junc. Km 0.900 to Km 9.400 on EPC mode under NH (O) in Gujarat
Short-Term Maintenance Contract (One Year) and Routine Maintenance including Incident Management of Bhakarapet to Kalur section of NH-71 from Km.77/400 to Km.101/000 (total length 23.600 Km) in the state of Andhra Pradesh
Const. of 6L EC from KM 12.695 to KM 14.100 in Kuwarbav sec of NH166 Descoped work of Ratnagiri Package1 in the state of Maharashtra on EPC Mode
R and S along with integrated routine maintenance incl. IM of 6L Panipat Khanna Sec NH-44 old NH1 from Km.96.000 near Panipat to Km.152.000 near Samana bahu in Haryana n Punjab on Item Rate Percentage basis
Rehab and strenth. along with integrated routine maintenance incl.IM of 6L Panipat Khanna Sec NH44 old NH1 from Km.152.000 near Samana bahu to Km. 212.000 near Ghaggar User FP in Haryana n Punjab on Item Rate Percentage) basis
Rehab and strength. along with integrated routine maintenance incl. IM of 6L Panipat Khanna Sec NH44 old NH1 from Km.212.000 near Ghaggar User FP to Km. 272.000 near Khanna in Punjab on Item Rate Percentage basis