Loading…
Loading…
9 results • Recent activity
Package 2 Construction of Boundary Wall along the river side at Left Bank of Teesta V PS, Balutar From RD 590.00m to RD 1129.00m, starting from the Kendriya Vidyalaya extending in front of the Central Store.
Repair of downstream Approach Road of Dam for proposed alternate Dam Control room along with Left Bank Slope stabilization work above EL plus minus 600M in the downstream of Dam axis of Teesta V Power Station.
Construction of Workshop Building of Teesta V PS at Left Bank Colony, Balutar.
Annual maintenance of Generating Units and its accessories of Teesta V PS for the financial year 2025 to 26.
Package 1 Construction of Riverbank Boundary Wall on the Left Bank of Teesta V Power Station, Balutar From RD 0.00 meters to RD 590.00 meters, starting from the suspension bridge and extending in front of the Kendriya Vidyalaya
Protective Ceramic coating on Spiral Casing, Stay Vanes and Top Cover of all the three Generating Units of Teesta-V Power Station