Loading…
Loading…
1,902 results • Recent activity
Complete servicing and rectification works of split air conditioners present at various locations under Stage-I during the year 2026-27
TGGENCO BTPS STAGE II GEN Division Labour charges towards attending operational issues of running equipment in areas such as Boiler Floor Turbine Floor Mills, Fans Area ESP Control Room CWP Pump House Fuel Oil Pump House Air Compressor Rooms and Ash Plant Area of Unit 3 Stg-II BTPS whenever and wherever required for FY-2026-27 i.e., for the period 01-04-2026 to 31-03-2027
TGGENCO BTPS STAGE-II CAM Division Removal of ash accumulated due to clearing of foreign material open ashing from ESP Hoppers and poking of ESP Hoppers in Unit-3 including surrounding drains trenches, drain sump and transporting to a distance of upto 5 KM for disposal at a location(Ash Pond) directed by Engineer in charge for the year 2026-27
TGGENCO BTPS STAGE II CAM Division Removal of ash accumulated due to clearing of foreign material, open ashing from ESP Hoppers and poking of ESP Hoppers in Unit 4 including surrounding drains trenches drain sump and transporting to a distance of upto 5 KM for disposal at a location(Ash Pond) directed by Engineer in charge for the year 2026-27
TGGENCO BTPS STAGE-II BM Division - Providing of Labour assistance in maintenance for removal, cleaning their internals, testing and assembling of guns in all elevations in Boiler furnace and also for cleaning oil leakages if any and dust at Oil skids, steam lines for guns at Unit 3 and Unit 4 Stage-II/BTPS, Manuguru for the FY 2026-27
BTPS - CHP - Replacement of New/Reconditioned rollers and frames, fabrication and erection of skirt rubber, scrappers etc. for periodical and breakdown maintenance of belt conveyors as and when required for the conveyor BCN - 1A/1B, BCN - 2A/2B, BCN - 3A/3B and ILMS 1 and 2 and contingency reclaim belt conveyors -1 and 2 in MM- I sub division in MM/CHP/BTPS for the period from 01.04.2026 or from the actual date of commencement of work to 31.03.2027