Loading…
Loading…
1,902 results • Recent activity
BTPS - CHP - Overhauling of damaged scoop coupling model ESC:1030 of ring granulators as and when required in MM/CHP/BTPS for the period from 01.04.2026 or actual date of commencement of work to 31.03.2027
BTPS - CHP - Replacement of damaged scoop coupling with reconditioned spare scoop coupling, oil filter cleaning, cooler cleaning, replacement of damaged DE/NDE bearing, geared coupling, realignments for ring granulator as and when required in MM-II subdivision of MM/CHP/BTPS from 01.04.2026 or from actual date of commencement of work up to 31.03.2027.
Tm-Divn:Labour Charges towards HP welding works for replacement of high pressure damaged and erodedlines and valves in TM Division during the year 2026 27
Comprehensive Annual Maintenance Contract charges for Progility make EPABX for the period from 01.04.2026 to 31.03.2027
TGGENCO - YTPS (5x800MW) - Stage-1 - Unit 1 - Carrying out Routine maintenance of all Boiler floors from top EL+95 meters to ground floor near Condensate Transfer Pumps area, minor repairs of LDO and HFO oil guns and removing of clinker formation at S-panel as on when required for the period from 01.04.2026 (or the actual date of commencement) to 31.03.2027
TGGENCO - NSHES - Supply of Slip Ring Carbon Brushes at NSHES, Nagarjuna Sagar.