Loading…
Loading…
1,902 results • Recent activity
KTPS-V stage -EM and MRT-Overhaul of 6.6KV HT boards and overhaul of 6.6 KV HT breakers of Unit-X during Overhaul for the year 2026-27-Reg
Overhauling of Boiler feed pumps (BFPs), Booster pumps (BPs) and Hydraulic Couplings, Inspection of DE and NDE bearings of BFPs and BPs etc in Units-1 and 2 as and when required during the year 2026-27
TGGENCO- YTPS (5x800MW) - Stage-1 - Unit 1 - Carrying out breakdown maintenance of Gravimetric Feeders as and when required on an urgent on-call basis from 01.04.2026 to 31.03.2027, to be reckoned from the actual date of commencement of work for the year 2026-27
TGGENCO-YTPS(5x800MW)-C I-I -Testing, Calibration, Servicing of Pneumatic and Hydraulic actuators, MOVs and other C I instrumentation in TG TG Auxiliaries, UPS and Batteries, Condensate Polishing Unit in the Service Vessel Area of Unit-1/Stage-I of Yadadri Thermal Power Station, Veerlapalem(V) for the period from 01.04.2026 or from the actual date of commencement of work to 31.03.2027
KTPS-VII STAGE-EMnCnI-Rewinding of stator of 130KW or 175HP motor in ICHP
Supply of Protection Shields /Shrouds with 2 Nos suitable clamps for BM div of Stage-I/ BTPS.