Loading…
Loading…
1,915 results • Recent activity
Supply of LRB Mattresses for 1X 500 MW Boiler
TGGENCO-KTPS VII Stage/Paloncha - Supply of Pressure relief valve on silo top in fly ash system
BTPS-CHP-Periodical and breakdown maintenance of vibro feeders, counter weights, sump pumps and other miscellaneous equipment for the conveyors BCN-10, 4A/B, 5A/B, 6A/B, 7A/B, TP-3, trippers TP-5, TP-4 and ERH as and when required MM-III sub division of MM/CHP/BTPS for the period from 01.04.2026 or actual date of commencement of work to 31.03.2027
BTPS-CHP-Preventive and breakdown maintenance of gear box/ couplings/scoop couplings, belt conveyors and conveyor equipment for SCRs and the conveyors BCN-8, BCN-9 as and when required MM-IV subdivision of MM/CHP/BTPS for the period from 01.04.2026 or actual date of commencement of work to 31.03.2027.
BTPS-CHP-Inspection, repair and cleaning of DFDS water sprinkling systems and greasing to the conveyors BCN-4A/B, 5A/B, 6A/B, BCN-10, 7A/B, Flap gates and tipper at MM-III sub division of MM/CHP/BTPS as and when required for the period from 01.04.2026 or from actual date of commencement of the work to 31.03.2027.
Supply of certain Motors for SCR-1 and 2 required in LT-II/O and E/CHP/BTPS