Loading…
Loading…
1,920 results • Recent activity
TGGENCO-KTPS VII Stage/Paloncha - Supply of Pressure relief valve on silo top in fly ash system
BTPS-CHP-Periodical and breakdown maintenance of vibro feeders, counter weights, sump pumps and other miscellaneous equipment for the conveyors BCN-10, 4A/B, 5A/B, 6A/B, 7A/B, TP-3, trippers TP-5, TP-4 and ERH as and when required MM-III sub division of MM/CHP/BTPS for the period from 01.04.2026 or actual date of commencement of work to 31.03.2027
BTPS-CHP-Preventive and breakdown maintenance of gear box/ couplings/scoop couplings, belt conveyors and conveyor equipment for SCRs and the conveyors BCN-8, BCN-9 as and when required MM-IV subdivision of MM/CHP/BTPS for the period from 01.04.2026 or actual date of commencement of work to 31.03.2027.
BTPS-CHP-Inspection, repair and cleaning of DFDS water sprinkling systems and greasing to the conveyors BCN-4A/B, 5A/B, 6A/B, BCN-10, 7A/B, Flap gates and tipper at MM-III sub division of MM/CHP/BTPS as and when required for the period from 01.04.2026 or from actual date of commencement of the work to 31.03.2027.
Supply of certain Motors for SCR-1 and 2 required in LT-II/O and E/CHP/BTPS
KTPS-VII Stage DD - Providing of one No. A/c Sedan Car on hire basis at 12 hours per day including fixed charges, fuel charges, driver salary, maintenance charges, road taxes, Insurance, all statutory payments etc with a mileage up to 1800 KM/Month for the official utilization by the Superintending Engineer DD KTPS VII Stage, for the period wef 01 04 2026 or from the actual date of commencement to 31 03 2027