Loading…
Loading…
1,920 results • Recent activity
BTPS-CHP-Preventive and Breakdown maintenance of gear box/ couplings/ scoop couplings for the conveyors BCN-4A/B 5A/B, BCN 10, 6A/B, 7A/B and Tripper as and when required in MM-III sub division of MM/CHP/BTPS for the period from 01.04.2026 or actual date of commencement of work to 31.03.2027.
BTPS-CHP-Regular maintenance and minor repair works of all mechanical equipment of stacker cum reclaimers-1 and 2 and preventive and breakdown maintenance of belt conveyors and conveyor equipment for BCN-8, BCN-9, Boom conveyors intermediate conveyors and tipper conveyors as and when required in MM-IV sub division of MM/CHP/BTPS for the period from 01.04.2026 or actual date of utilization of work to 31.03.2027
BTPS-CHP-Preventive and Breakdown maintenance of Tripper, ILMS-3 and 4, Flap gate actuators, Guide pipes and Bunker sealing belt as and when required in MM-III sub division of MM/CHP/BTPS for the period from 01.04.2026 or actual date of commencement of work to 31.03.2027.
KTPS-VII Stage - Civil - O and M-I - SD-I - Environment - Renewal and AMC of Software Connectivity to three (03) CAAQM Stations parameters (SO2, NOx, PM10, PM2.5) and a CEMS parameters (SPM, SO2 and NOx) to TGPCB and CPCB Servers for the period from 01.04.2026 to 31.03.2027
TGGENCO-KTPS-VII Stage-BM-Procurement of Galvalume Trapezoidal Profile Roofing Sheets with 0.5mm thickness-Quotation Called for-Regarding
BTPS-CHP-Regular and preventive periodical maintenance for Belt Feeder-1,2,3 and 4 and flap gates as and when required in MM-II sub division of MM/CHP/BTPS for the period from 01.04.2026 or actual date of commencement of work to 31.03.2027