Loading…
Loading…
1,923 results • Recent activity
Supply of Copper cables for 500MW boiler for upcoming 2025-26 overhaul and emergency shutdown works
BTPS-CHP-Regular and preventive maintenance of 04 Nos BD-355 Dozers and 02 Nos BL200-1 Wheel loaders required in MM-IV sub division of MM/CHP/BTPS for the period of from 01.04.2026 or from actual date of commencement of work to 31.03.2027.
BTPS - CHP - Preventive and breakdown maintenance of Pulleys, Bearings/Sleeves of Pulleys and scoop oil cooling system as and when required for the conveyors BCN-4A/B, 5A/B, 6A/B, BCN-10, 7A/B, ILMS, Trippers and flap gates required in MM-III sub division of MM/CHP/BTPS from 01.04.2026 or actual date of commencement of work to 31.03.2027
BTPS - CHP - Preventive and breakdown maintenance of coal sampling system, ventilation system at MCC-3 and ERH, DE system-1,2,3 and 4 at bunker floor required in MM-III subdivision of MM/CHP/BTPS for the period from 01.04.2026 or actual date of commencement of work to 31.03.2027
BTPS - CHP - Cold and Hot vulcanization belt joints, pulley lagging for the conveyors BCN-1A/B, 2A/B, 3A/B Reclaim belt conveyors and Dribble Feeders as and when required in MM-I sub division of MM/CHP/BTPS for the period from 01.04.2026 or from the actual date of commencement of work to 30.09.2026.
KTPS-V VI Stages - Civil- Removal and disposal of wet ash/ silt debris from the drains D5, D6, D7 and chambers of Sedimentation tank including disposal of dry ash deposits near sedimentation tank to ash pond of KTPS V VI Stages as and when required for the period from 01.04.2026 or actual date of commencement to 31.03.2027