Loading…
Loading…
1,917 results • Recent activity
KTPS-VII Stage - Civil - O and M-I - SD-II - Providing of wet mix approach road beside MCC1 to C and I Storage shed in CHP area of KTPS Stage-VII, Paloncha
TGGENCO YTPS 5x800MW Stage 1Unit1Carrying out preventive and routine maintenance and minor repair works of HP-1103 Bowl Mills, Gravimetric Feeders, Coal Pipes, Mill Lube Oil Systems, and their connected equipment as and when required for the period from 01.04.2026 or actual date of commencement to 31.03.2027
TGGENCO-YTPS (5x800MW) Stage1 Unit 2Carrying out preventive and routine maintenance and minor repair works of HP1103 Bowl Mills, Gravimetric Feeders, Coal Pipes, Mill Lube Oil Systems, and their connected equipment as and when required for the period from 01.04.2026 oractual date of commencement to 31.03.2027
TGGENCO - YTPS (5x800MW) - Stage-1 - Unit 2 - Carrying out breakdown maintenance of Mill Rejection System of HP-1103 Bowl Mills as and when required on an urgent call basis from 01.04.2026 to 31.03.2027, to be reckoned from the actual date of commencement.
TGGENCO - YTPS (5x800MW) - Stage-1 - Unit 1 - Carrying out breakdown maintenance of Mill Rejection System of HP-1103 Bowl Mills as and when required on an urgent call basis from 01.04.2026 to 31.03.2027, to be reckoned from the actual date of commencement.
TGGENCO-YTPS(5X800 MW)-TE-IV-Cleaning/Replacement of various oil filters and Repair/Servicing of various pumps in TM/IV/Stage-II/YTPS from 01.04.2026 or actual date of commencement of work to 31.03.2027 for the FY 2026-27