Loading…
Loading…
1,917 results • Recent activity
TGGENCO - YTPS (5x800MW) - Stage-1 - Unit 1 - Rectification of tube leaks in Boiler-1, on an urgent on-call basis during emergency shutdown from 01.04.2026 to 31.03.2027 to be reckoned from the actual date of commencement to 31.03.2027.
TGGENCO - KTPS VII Stage - P31 - CHP - EM - Supply, erection, commissioning of 6.6KV Vacuum circuit breakers of ICHP - Quotation called for - Reg.
BTPS - CHP - Periodical and breakdown maintenance of vibro feeders, counter weights, sump pumps and other miscellaneous equipments for the conveyors BCN-10, 4A/B, 5A/B, 6A/B, 7A/B, TP-3, trippers TP-5, TP-4 and ERH as and when required MM-III sub division of MM/CHP/BTPS for the period from 01.04.2026 or actual date of commencement of work to 31.03.2027
TGGENCO - KTPS VII Stage - P31 - CHP - EM - Procurement of Three Phase Energy Meter - Quotation called for - Reg.
Supply of consumables required for Engineer and operator workstations of UCB
KTPS-V-BM- Service charges Rendered to Safety valves (Boiler and Turbine) Overhaul works and Safety valves seat cutting service person, Arranging of Safety valves seat cutting machine during Unit-10 AOH-Reg