Loading…
Loading…
1,917 results • Recent activity
KTPS-V-BM-Service charges Rendered to Overhaul of Soot Blowers (WWSBs and LRSBs) and Boiler all Hanger supports Inspection and Repair and Replacement works of Unit -10 AOH-Reg
KTPS-V-BM-Service charges Rendered to Overhaul of Boiler Pressure parts and Overhaul of Boiler Burners of Unit-10 Annual Overhaul works-Reg
BTPS - CHP - Maintenance of Apron feeders and Dribble feeders equipment viz pulleys, bearings/sleeves of pulleys, periodical and breakdown works as and when required in MM-I sub division of MM/CHP/BTPS for the period from 01.04.2026 or actual date of commencement of work to 31.03.2027
BTPS - CHP - Erection of reconditioned/fabricated dummy MS plates and SS/Sail Hard liner plates to the hitting areas of discharge chutes, patch welding for the conveyors BCN-1A/B, 2A/B, AFD-1 and 2 and connecting chutes at TP-1 and FG-1,2,3 and 4, BCN-3A/3B and connecting chutes at TP-2 and FG-5 and 6 and contingency-1 and 2 chutes in MM-I Sub division of MM/CHP/BTPS for the period from 01.04.2026 or from the actual date of commencement of work to 31.03.2027
Supply of Cable Terminal Ends
Bulb Rubber Seals and Flat Rubber Seals for stop log gates of CWPH