Loading…
Loading…
6,614 results • Recent activity
MTPS I TM UNIT III Changing the defective BFP 3B discharge NRV as per IBR specification by IBR welding and replacement of the defective BFP Suction valve 3B changing the eroded drip line reducers expanders and changing the defective eroded plug broke
MTPS I TM Unit III Overhauling and gasket renewing of Valves in Feed Water Main Condensate Heater drain drain water and Auxiliary Steam during Unit III AOH 2025 26
MTPS I Mill Plant Centralised AC Plant Attending Breakdown works in AC Compressor No 2 and 3 AC Cooling tower fans Air handling units Air washer system Circulating water pumps pipe lines and valves etc for a period of 365 days
MTPS I TM UNIT IV Replacing the defective valve VDAS 122 eroded Flash tank-I changing the eroded drip line reducers expanders and changing the defective eroded plug broken 1 2 drain line vent line valves pipes bends by IBR Non IBR
MTPS I Mill Plant AC Plant Replacement of existing damaged return air duct outside the Conference Hall AHU room renewal of insulation extending supply air duct in CE office and Providing down comer spool piece towards UPS panels etc