Loading…
Loading…
6,613 results • Recent activity
Conducting Soil Investigation design of footing for Control room proposed Gopalapuram 110/11KV SS
MTPS I Mill Plant Unit III Removal of worn out thinned out wall plates of bunkers 3E 3F and erection of new wall plates of 12 16 mm thick MS plates and supporting beams and other related works
MTPS1 TM Unit II Overhauling of OLCTC System Pump LHS RHS Overhauling 1600 mm Butterfly valve and its actuator gear box of cooling water inlet and outlet pipe lines in condenser Inspection Cleaning of Condenser CW box steam side Hot well
Procurement of 1.5 Ton Split air conditioner unit including copper condenser with given accessories - 8Nos.
MTPS I Mill Plant Unit III Removal of worn out thinned out wall plates of bunkers 3A 3B and 3C and erection of new wall plates of 12 16 mm thick MS plates and supporting beams and other related works
MTPS I TM UNIT III Changing the defective BFP 3B discharge NRV as per IBR specification by IBR welding and replacement of the defective BFP Suction valve 3B changing the eroded drip line reducers expanders and changing the defective eroded plug broke