Loading…
Loading…
6,613 results • Recent activity
Conducting preliminary survey E.Kumaralingapuram 110/33-11 KV SS
Conducting soil Investigation design of footing for the Control room proposed E. Kumaralingapuram
Mechanical maintenance works at Valuthur GTPS Phase I for a period of 1 year
MTPS I TM Unit III Replacing the existing defective vent condenser tube nest by spare tube nest in Unit III during 2025 26
MTPS I TM Unit II Renewal of Gasket at water box side tube nest side condensate inlet and outlet flange inspection and cleaning of tube nest and hydraulic testing of LPH 2 3 4 GC 1 Ejector 2A Vent condenser and Renewal of Gasket at Deaerator main
MTPSI TM Unit II Cleaning and painting of inner and Outer portion of Receiver Tanks of 1 2 for Instrument Air and renewal of Manhole door gaskets and Overhauling of Safety valves of Receiver Tanks Overhauling of Silica gel type Air drier accessories