Loading…
Loading…
6,614 results • Recent activity
MTPS I Mill Plant Unit II Coal flow system to boiler Rotating the existing eroded straight coal pipes of mills 2A 2B 2D 2E 2F to 180 deg at 16 meter level above the mill and below the 18 meter floor etc during capital overhaul 2024 25
MTPS I CA CWS II Overhauling of existing I.D fan Gearbox for 1 No including static balancing of fan blades painting of gear box fan blades hub and arm sleeves etc in Cooling Tower IV
MTPS I Mill Plant Unit II Dismantling hard facing and assembling of 1 meter length coal pipes after MOE mill outlet Elbow in Mill 2A to 2F during Capital overhaul 2024 25
MTPS I BM Lift Supply Erection and commissioning of Control Panel 1 No for Boiler Lift II of MTPS I
MTPS I Mill Plant Unit III Complete dismantling and reassembling of bowl assembly worm gear housing worm wheel mill bottom insulation cover plates broken main vertical shaft renewal of vertical shaft etc in Coal Mill 3F (Tilting work)
MTPS I Mill Plant Unit II Complete dismantling of Mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub Mill bottom in any Mill 2A to 2F of Unit II