Loading
Loading…
Loading…
6,614 results • Recent activity
MTPS I BM Unit I Removal of deteriorated and peeled off insulation and re insulation with new insulation materials on the Portion in ID fan 1A and 1B casing portion and other related works
Supply of 150 NB MS ERW pipe 1500 Mtrs
Procurement of MS ERW pipes 4 Items
Procurement of V Belts of Various sizes in AC and Ventilation system 10 Items
Procurement of Cassette Baffle for Horizontal coils Primary Reheater Level Bundle with three clamps length 400 mm Breadth 60 mm width 3400mm thk 2.5mm SS 304 As per Drawing enclosed 178 Nos
Cassette Baffle forHorizontal coils rear side Low Temperature reheaterLower bank length 850mm Breadth 67mm width 1000mm thk 2.5mm 50 Nos