MTPS I TM Unit II Removal of insulation and providing re insulation to pipe Lines valves Deaerator main flange, Gland steam cooler Low pressure heater Flash tanks and its accessories and disposal of waste insulation materials for Unit II Annual overh
As per NIT
MTPS-I ES Circle EM-II CWPH - Repair and Servicing of 3 phase, 6.6KV,1175 KW, BHEL make, 494 RPM, vertical mounted HT motor of CWP 2B Sl.No 32126 A 404 016
MTPS I M I CA CWS I De watering complete cleaning and sludge removal Cleaning with bleaching powder painting the structure of Clarifier II during AOH 2025 26
MTPS I TM Unit II Removal and Re insulation of HP IP control Valve area Spindle leak off lines Gland steam pipes of LP front rear in Main Turbine during Annual Maintenance work 2025 26
MTPS I BM Unit II Boiler pressure parts AOH 2025 Overhauling of Secondary Air Dampers Scanner Air Fans and its damper flap gate Reconditioning of damaged wind Box compartment etc