Loading…
Loading…
6,575 results • Recent activity
MTPS-I ES Circle EM-I Unit-I Complete cleaning, Tightness checking of horizontal, vertical bus bars, bus bar joints, outgoing terminals and checking IR value of 6.6 KV HT bus C1 and its Tie Bus duct and painting of C1 bus panels its Tie bus duct Ti
Supply of consumables for ERW Pipes with bends
MTPS-I ES Circle EM-IDismantling the defective BFP Cooler with nest attending the defect in the released BFP cooler and re-erection of the BFP cooler with nest in BFP motor for Unit-I to IV Dismantling the defective stator water cooler attending the
SUPPLY OF 11 KV 30KN STRAIN DISC HARDWARE
Erection of 110 KV DC Line on DC tower (2.130kM)by making LILO in the existing 110 KV Theni Sempatty II Feeder for the Proposed Jeyamangalam 110 kV SS with supply of all materials(Reach 3).
MTPS I MM AEE I C I Procurement of Process Loop Calibrator