Loading…
Loading…
6,516 results • Recent activity
MTPSI TMI Unit IV Inspection and Overhauling of Oil Vapour Extraction Fan assembly Cleaning of strainer assembly and cooling water lines of ESV IV during AOH 2025 26
Procurement of 500 Nos of Rain Coat with Cap (Shirt and Pant Model)
MTPS I TM Unit IV Renewal of Gasket at water box side tube nest side condensate inlet and outlet flange inspection and cleaning of tube nest and hydraulic testing of LPH 3 4 GC 1 Ejector 4B and Renewal of Gasket at Deaerator main flange
MTPS I BM Unit III Boiler Pressure parts Maintenance of various sizes of hanger in critical pipe lines and allied works etc
MTPS TM Unit IV Removal of insulation and providing re insulation to pipe Lines valves Deaerator main flange Gland steam cooler Low-pressure heater Flash tanks and its accessories and disposal of waste insulation materials for Unit IV
SUPPLY OF LT THREE PHASE CHANNEL CROSS ARM