Loading…
Loading…
6,464 results • Recent activity
MTPS I TM Carrying out Bullet cleaning by specially designed Phosphor Bronze Bullet shot of LHS RHS of condenser tubes in Unit I condenser during AOH of 2025 26
Supply of M.S. Grill Size 1.5 mtr x 1.5 mtr for ash handling pump house of Unit IV and V
MTPS I TM Unit I Removal and Reinsulation of HP IP control Valve area Spindle leak off lines Gland steam pipes of LP front rear in Main Turbine during Annual Maintenance work 2025 26
SP.109 NCTPS-II ES circle MRT Division Unit II Generator Turbine and Boiler areas and their Auxiliaries Time Bound Contract works for the Routine Maintenance of MRT equipment for a period of 360 Days upto 31 03 2026 from the date of taking over
Fabrication and Supply of 500 NB 450 NB SS316Gr Pipes and fittings for Unit IV Ash water tank incoming and interconnection line for stage III Ash water pump house
MTPS I CHP I Removing wornout damaged rails dismantling the PSC concrete sleepers with fittings removing coal powder on the track line providing bed PCC mix WT V inhaul