Loading
Loading…
Loading…
6,370 results • Recent activity
SUPPLY OF SPARES SAFETY VALVES AND SOOT BLOWER IN UNIT I, II and III BOILER
Procurement of LT Shackle Insulator 10000nos
NCTPS I SE M II Circle ECHS Dn Strengthening of existing severely damaged corroded structure of feeder conveyor trailer conveyor rocker assembly and head pulley frame of wagon loader I
SUPPLY OF SHAFT ENCLOSING TUBE NO1 FOR COOLING WATER PUMPS OF UNIT I II and III MODEL 1050 VM4A12
SUPPLY ERECTION AND COMMISSIONING OF DISCHARGE PIPE WITH MAN HOLE TAPPING FOR CONDENSER INLET EAST SIDE OD 1650 MM ID 1600 MM, LENGTH 5000 MM THICK 25 MM OF UNIT V
ECHP-II- Reconditioning of various size of idler rollers at Primary Crusher House-II and Secondary Crusher House-II