Loading…
Loading…
6,346 results • Latest
Removal of Chocking in the Catch pits in the Mill and Boiler areas and Clearing the drains around the Power House Unit 4 and 5 Stage 3 and Drains around the Fuel Oil Tanks for the period from 01.04.2026 to 31.03.2027
Removing of silt, slush, debris, etc. in 1370E road, around rejected coal stone yard, around SCH 2 building and along 457.5E road drain up to cross drain for the period from 01.04.2026 to 31.03.2027
Flame scanner guide tube Assembly for Boilers
Sweeping and Cleaning of Switchyard 2 roads, drains and garden maintenance for the period from 01.04.2026 to 31.03.2027
Sweeping and Cleaning of all roads in Internal Coal Handling Plant area for the period from 01.04.2026 to 31.03.2027
Supply of Three Phase Angle Cross Arm