Loading…
Loading…
6,225 results • Latest
5000 NOS LT TI FITTING 5000NOS HT TI FITTING AND 3000NOS LT 1PH ANGLE CROSS ARM
Construction of control room building with Electrification works,Bore well, Providing Transformer Plinth and various SS structures Plinth foundation, Cable duct, and allied civil works for the New 33/11 KV SS at Upparapatty in Krishnagiri EDC
Repair and Maintenance Works to the Lift Motor Room at EL 56.50 mtr level of Freight Lift 2
Construction of control room building with Electrification works,Bore well, Providing Transformer Plinth and various SS structures Plinth foundation, Cable duct, allied civil works for 33/11KVSS at Vellakuttai in TEDC Tirupattur
Carrying out improvement works to the EE O M office rear side of Mettupalayam 110 22 KV SS
Supply of SubStation Structure materials Bus Scheme material Cables Safety Equipments Tools and Plants for introduction of 110 33KV System at 110 11 KV Irugur Sub Station 33 KV side in Coimbatore operation Circle of Coimbatore