Loading…
Loading…
6,619 results • Recent activity
MTPS I BM Unit I Boiler pressure parts AOH 2025 Disposal of Ash from Pent house Eco hopper deflection slope rear arch room and boiler roof area strengthening of Eco hopper supports with new pipes and allied works
MTPS I BM AOH 2025 Unit I Boiler pressure parts Cutting and removing of heavily wornout rear arch room roof plate Supply fabrication and erection of HR Sheet at rear arch room and allied works
MTPS I BM AOH 2025 Unit I Boiler pressure parts Replacing overheated HRH stub bends and other circuit bends at penthouse area and allied works
MTPS I BM Unit I AOH 2025 26 Renewal Reconditioning of various Saw tooth expansion joints in FG ducts and Air ducts and other related works etc in both A and B sides
MTPS I BM Unit I Boiler pressure parts AOH 2025 Rectification Replacement of defective tubes in LTSH Coils Economizer hanger tubes steam cooled side walls and fin welding in boiler IInd pass area
MTPS I BM Unit I Annual overhauling 2025 26 Overhaul of ESP AB and CD pass Internals and related works