Loading…
Loading…
60 results • Latest
Construction of 19 Nos Self Finance Scheme Semi Finished Houses Type design 62/128 in Sector 12A of Majhola Yojna No 4 Phase 2 Vistar Moradabad.
Construction of 16 Nos Self Finance Scheme Semi Finished Houses Type design 45/75 in Sector 12A of Majhola Yojna No 4 Phase 2 Vistar Moradabad.
Construction of 17 Nos. Self-Finance Scheme, Semi-Finished Houses (Type design 90/162) in Sector-12A of Majhola Yojna No. 4, Phase-2 (Vistar), Moradabad
Construction / strengthening work of CC road and drain under Infrastructure Fund in Ward No-37 Nadosi, Bareilly district, from Maurya house to Kanhaiya Lal house, Kanhaiya Lal house to the Temple, and Temple to Anil Yadav house.
Road strengthening work under Infrastructure Fund in Civil Lines Yojna No-4 and Rajendra Nagar Yojna of the Parishad, Bareilly.
Construction / strengthening work of CC road, drain, and culvert under Infrastructure Fund near Bannuwal Vyas World School and in 90C Veer Savarkar Nagar, Bannuwal, Bareilly district.
Construction / strengthening work of CC road and drain under Infrastructure Fund in Keshav Vatika Colony located at Karmchari Nagar, Bareilly district.
Construction / strengthening work of CC road and drain under Infrastructure Fund from FCI Colony to Veer Savarkar Nagar Crossing in Bareilly district.
Construction / strengthening work of CC road and drain under Infrastructure Fund in Ward No-37 Nadosi, Bareilly district, from Maurya house to Kanhaiya Lal house, Kanhaiya Lal house to the Temple, and Temple to Anil Yadav house.
Construction of 24 Nos. Self-Finance Scheme, Semi-Finished Houses (Type design 90/162) in Sector-14 of Majhola Yojna No. 4, Phase-2 (Vistar), Moradabad