Loading…
Loading…
132 live70 closing this weekmost from U.P. Housing and Development Board
132 results • Latest
Construction work of guard room in Kasturba Gandhi Balika Vidyalaya Dakor Rampura and toilet block in Kasturba Gandhi Vidyalaya Kadaura Konch Jalaun and Rampura of Jalaun district
Construction work of septic tank and toilet block in Kasturba Balika Vidyalaya Bamor Gursarai Mauranipur Month Babina Bangra Chirgaon and Forest Village in Jhansi
CONSTRUCTION OF BOUNDERY WALL AND GUARD ROOM AT KASTURBA GANDHI BALKIA SCHOOL JAKHURA LALITPUR
CONSTRUCTION OF GUARD ROOM AT K.G.B.V. GOHAND,K.G.B.V. MUSKRA, AND K.G.B.V. KURARA,AND CONSTRUCTION OF BOUNDARY WALL AT K.G.B.V. SARILA DIST. HAMIRPUR
CONSTRUCTION WORK OF BOUNDARY WALL AND M.S. GATE AT K.G.B.V. JAITPUR AND K.G.B.V. PANVARI ,DIST MAHOBA
CONSTRUCTION OF BOUNDARY WALL AT K.G.B.V. CHITRAKOOT DIST. CHITRAKOOT
CONSTRUCTION OF BOUNDARY WALL AT K.G.B.V. MANIKPUR DIST. CHITRAKOOT
CONSTRUCTION WORK OF STAFF RESIDENCES FOR SAMEKIT SPECIAL SECONDARY SCHOOL DISTRICT- FATEHPUR.
FIRE FIGHTING WORK IN FIVE COMMUNITY HEALTH CENTRE (ALIGANJ, SAKIT, MARHERA, JAITHARA AND JALESAR) AT ETAH.
Construction of Toilet Blocks at Kasturba Gandhi Balika Vidyalayas Nawabganj Asoha Auras Bangarmau Hilauli Sikanderpur Sarosi Septic Tanks Hasanganj Bangarmau Hilauli and Guard Room Bichhiya Dist Unnao
Construction of Staff Residences at Samekit Vishesh Madhayamik Vidyalay Sonbhadra
Strengthening of Fire Safety Arrangements, Automatic Fire Alarm, Sprinkler System, Smoke Extraction System and Smoke Management Systems at Bhaurao Deoras Combined Hospital, Mahanagar, Lucknow, under the Department of Medical Health and Family Welfare
Laying of internal sewer line and sewer connection work in Sector 1A, 1B and 1C of Saumitra Vihar Yojna Lucknow
CONSTRUCTION WORK OF C.O. RESIDENCE RANIGANJ, DISTRICT-PRATAPGARH.
RENOVATION WORK OF PT. SATYANARAYAN SHASTRI MALE HOSTEL UNDER GOVERNMENT AYURVEDA COLLEGE AND HOSPITAL VARANASI
CONSTRUCTION WORK OF THE OFFICE FOR C.O. RANIGANJ, DISTRICT-PRATAPGARH.
Construction of Ground Plus 5 Storey 320 Person Capacity Barrack at New Police Lines Kalli Paschim of Commissionerate Lucknow.
CONSTRUCTION OF 24 NOS. TYPE-III RESIDENCES STILT FLOOR TO SIX FLOOR, SUB STATION, EXTERNAL ELECTRICAL WORK, C.C. ROAD,DRAIN,INTERLOCKING.RAIN WATER HARVESTING, 16 PERSONS LIFT AND 250KVA D.G. SET AT JAGADGURU RAMBHADRACHARYA DIVYANG STATE UNIVERSIT
CONSTRUCTION OF 32 NOS. TYPE-IV RESIDENCES STILT FLOOR TO EIGHT FLOOR, 04 NOS GARRAGE , PUMP ROOM, TUBE WELL,C.C. ROAD,DRAIN,INTERLOCKING.RAIN WATER HARVESTING, 16 PERSONS LIFT AND 250KVA D.G. SET AT JAGADGURU RAMBHADRACHARYA DIVYANG STATE UNIVERSIT
CONSTRUCTION OF 12 NOS. TYPE-II RESIDENCES STILT FLOOR TO THREE FLOOR, C.C. ROAD,DRAIN,INTERLOCKING, RAIN WATER HARVESTING, 16 PERSONS LIFT AT JAGADGURU RAMBHADRACHARYA DIVYANG STATE UNIVERSITY CHITRAKOOT, DISTRICT- CHITRAKOOT (U.P.)
CONSTRUCTION WORK OF INCOMPLETE BUILDING AND EXTERNAL DEVELOPMENT WORK AT GOVT. GIRLS INTER COLLEGE , MANIKPUR DISTT. CHITRAKOOT
ONSTRUCTION OF GOVT. GIRLS INTER COLLEGE AT RAJAPUR DISTT. CHITRAKOOT
Door to Door collection transportation and processing of solid waste generated in the Siddharth Vihar Scheme Ghaziabad covering a developed area of 128.11 hectares.
Strengthening of Road from Eidgah Road to Shivgarhi, Hapur Bulandshahr Main Road to Ramgarhi Chauraha via Mohalla Majidpura and Maintenance of Park, Construction of Drain and Interlocking Work at Ambedkar Nagar Yojna No.-1 in District Hapur
Construction of 600 KL capacity and 26 Mtr. Staging shell type O.H.T. in Zone-3 at Ajantapuram Yojna, Ghaziabad
CONSTRUCTION WORK OF 450 METER BOUNDARY WALL IN KASTURBA GANDHI AWASIYA BALIKA VIDYALAYA MANDHATA, DISTT-PRATAPGARH.
CONSTRUCTION WORK OF 450 METER BOUNDARY WALL IN KASTURBA GANDHI AWASIYA BALIKA VIDYALAYA KALAKAKAR, DISTT-PRATAPGARH.
CONSTRUCTION WORK OF 450 METER BOUNDARY WALL IN KASTURBA GANDHI AWASIYA BALIKA VIDYALAYA LALGANJ, DISTT-PRATAPGARH.
CONSTRUCTION WORK OF 400 METER BOUNDARY WALL IN KASTURBA GANDHI AWASIYA BALIKA VIDYALAYA GAURA, DISTT-PRATAPGARH.
CONSTRUCTION WORK OF 400 METER BOUNDARY WALL IN KASTURBA GANDHI AWASIYA BALIKA VIDYALAYA SANGIPUR, DISTT-PRATAPGARH.
CONSTRUCTION WORK OF 400 METER BOUNDARY WALL IN KASTURBA GANDHI AWASIYA BALIKA VIDYALAYA BABAGANJ, DISTT-PRATAPGARH.
Interlocking work, main gate, and drain cover related works at Bhumi Vikas evam Grihasthan Yojna No. 3, Jhansi Construction of culvert, drain, and apex road from the Main Road via Shivsai Vatika up to the Primary School Ward No. 01 (Hasari Zone-02)