Loading…
Loading…
3,849 results • Latest
Restoration of Nandgram Bund from Km. 0.000 to 5.000 damaged by Installation of Mono pole by Uttar Pradesh Power Corporation Lmt.
TN-05/EE/2026-27 Reconstruction work of the damaged bridge located at Km 1.950 of Minor Shakhwaira.Lot No-11
Boundary wall and other works of Mehwar Store for the protection of government land under the Deoband branch section of Roorkee in the Tehsil Roorkee of Haridwar district.
TN-05/EE/2026-27 Reconstruction work of the damaged bridge located at Km 1.040 of Minor Sathala.Lot No-10
TN-05/EE/2026-27 Reconstruction work of the damaged bridge located at Km 1.380 of Minor Ladpur.Lot No-09
TN-05/EE/2026-27 Reconstruction work of the damaged bridge located at Km 36.485 of Upper Parikshitgarh Rajbaha.Lot No-05
TN-05/EE/2026-27 Reconstruction work of the damaged bridge located at Km 35.765 of Upper Parikshitgarh Rajbaha.Lot No-04
Reconsruction of V.R.B(Box Culvert) at Km. 13.300 of Jajau dy.
TN-05/EE/2026-27 Reconstruction work of the damaged bridge located at Km 33.400 of Upper Parikshitgarh Rajbaha.Lot No-03
TN-05/EE/2026-27 Reconstruction work of the damaged bridge located at Km 27.745 of Upper Parikshitgarh Rajbaha.Lot No-02
TN-05/EE/2026-27 Reconstruction work of the damaged bridge located at Km 26.400 of Upper Parikshitgarh Rajbaha.Lot No-01
Earth work from Km 0.000 to Km 0.750 of the damaged top and slope of the Marginal Bundh constructed on the right bank of Ken River under District Banda (LOT-01)
TN-04/EE/2026-27 Reconstruction work (box culvert) of damaged bridge located at Km 5.946 of Minor Akbarpur. Lot No-09
TN-04/EE/2026-27 Reconstruction work (box culvert) of damaged bridge located at Km 2.715 of Minor Bhumma. Lot No-08
TN-04/EE/2026-27 Reconstruction of damaged bridge (box culvert) located at Km 0.000 of Minor Bhumma. Lot No-07
Internal Clearance of Gopau Dy. From Km. 0.000 to Km. 27.000
Construction of RCC Precast Boundary Wall of Nizampur IH
TN-04/EE/2026-27 Reconstruction work (box culvert) of the damaged bridge located at km 8.790 of Rajwaha Upper Chudiala. Lot No-03
TN-04/EE/2026-27 Reconstruction work (box culvert) of the damaged bridge located at km 3.443 of Rajwaha Anti. Lot No-02
Rehabilitation Work of damaged portion of lining of MWGC from km 71.000 to 71.800, km 72.400 to km 73.500 and km 74.450 to km 74.700 Irrigation division Kushinagar in district Kushinagar
TN-04/EE/2026-27 Reconstruction work (box culvert) of the damaged bridge located at Km 18.336 of Rajwaha Salarpur. Lot No-01
Janpad hardoi me hardoi khand sharda nahar hardoi ke antargat Peng rajwaha ki kshatigrast pakki sanrachnao ke punarnirman karya
Janpad hardoi me hardoi khand sharda nahar hardoi ke antargat Sihauna rajwaha ki kshatigrast pakki sanrachnao ki punarniman ka karya
Work of laying stone soling (Khadanja) on various reaches of the left bank of the Shahjahanpur Branch under the control of the Sharda Canal Division, Shahjahanpur between km 29.500 and km 93.920 (Lot No. 07)
LOT-04 Restoration of Akauna Dy. from Km 0.000 to Km 10.000 under the Dhasan Canal System in District Hamirpur.
LOT-03 Restoration work of Jariya Dy. from Km 0.000 to Km 9.650 under the Dhasan Canal System, Saprar Division, Jhansi, in District Hamirpur.
Restoring capacity of Shobhapur Escape off taking from km 207.250 R/B of S.S.F.C.
Construction work comprising boundary pillars, wire fencing, and a guard/watchman room on departmental land within the premises of the Bewar Barrage, under the Irrigation Division, Etah.
Restoration of pitching work from the head of the Lower Ganga Canal (upstream of Narora Barrage) up to the 2.000 km mark in Bulandshahr district.
As per the NIT
Brick Soling Work Between Km 0.000 To Km 2.200 Of Ramnagar Thuthibari Bund On The Right Bank Of Chandan River In District Maharajganj.
Brick Soling Work Between Km 0.000 To Km 1.625 And Km 2.240 To Km 3.565of Lakshmipur Bharawaliya Bund On The Left Bank Of Chandan River In District Maharajganj.
Renovation repair work of the main gate of Guru Gorakshnath Ghat at Rajghat in District Gorakhpur
Construction of Fall at Km. 12.600 of Tail Dy
Construction of 7 Nos. Outlets of Isapur Minor
As per the NIT
As per the NIT
01/EE/2026-27 Reconstruction of VRB of Rt. Bhola Dy. at km. 0.800 (Lot-2)
As per the NIT
construction of boundry pillar
construction of outlet
construction of V.R.B
Silt accumulation in the inner section of the Sukhpura Escape on the left side between km 0.040 and km 0.750, and on the right side between km 1.400 and km 1.500.
construction of boundry pillar
construction of V.R.B
Work of silt removal situated on the right/left bank of the Chaf Branch between km 13.000 and km 13.400.
Work of silt removal situated on the right/left bank of the Chaf Branch between km 12.200 and km 12.600.
Work of silt removal situated on the right/left bank between km 9.300 and km 9.700 of the Chaf Branch.
Work of silt removal situated on the right/left bank between km 4.300 to km 4.700 of the Chaff Branch.
Work of silt removal on the Jokwa Dy. between km 7.800 and km 14.000.